User guide

Welcome to H₂VALIS

This guide takes you through an assessment from the first sign-in to the downloaded decision file. Each step explains what to enter, how to choose it, what you can change, what the review fixes and what the platform estimates for you. Terms with a dotted underline, such as LCOH or NPV, show their definition when you rest the cursor on them.

§01

What H₂VALIS does

H₂VALIS estimates what a green-hydrogen plant of a given size would produce, cost and earn at a given site, and what its environmental and social footprint would be. Every number comes from the equations of the literature review on which the platform is built, and every number is tied to the installed capacity:

installed capacity → hydrogen production → production, storage and delivery cost → earnings (revenue, NPV, IRR) → environmental and social impact

It is a screening tool for comparing options, e.g. two technologies, two plant sizes or two delivery routes. The results can be close to or far from a real project, so they do not replace a feasibility study, site data or vendor quotes, and they are not investment advice.

The H₂VALIS workflow from signing in to downloading the decision file1Sign in2Create a project3Create a scenarioSCENARIO EDITOR · TABS §1–§74Identity& location5Monetary6Corrections7Utilities8Production9Storage10Transport11Simulation (tab §8)run, read, adjust12Save version13Decision fileprint to PDF or download HTML
Figure 1. The thirteen steps of an assessment. Steps 4–10 are the tabs of the scenario editor; you can go back to any tab at any time, and every result is recalculated at once.

§02

Before you start

An assessment takes about ten minutes when the following information is at hand. Anything you do not know can stay at the review's default value.

  • Site: the town or region, or at least the country
  • Electricity: the price you expect to pay at the plant, its unit and currency, and the source (contract, market, self-generation)
  • Plant: the electrolyser type if already chosen, the capacity in MW and the expected running hours
  • Storage: how much of the output has to be stored, and for how many hours
  • Delivery: where the hydrogen goes, by which mode, which share and over what distance
  • Market: the sale price of the hydrogen, if known (the review uses €6.38/kg)
Inputs you provide, values fixed by the review, results estimated by H₂VALIS and items outside the modelYOU PROVIDEPlant locationElectrolyser and capacity (MW)Capacity factor and lifetimeElectricity price and its sourceStorage and delivery planHydrogen sale priceFIXED BY THE REVIEWCAPEX law, SEC, stack lifefade rates, cost lawsWACC 8 %, bank rate 2.25 %H₂VALIS enginethe review's equations,one calculation chainPLATFORM ESTIMATESHydrogen output (t/yr)LCOH and delivered cost (€/kg)I₀, NPV, IRR, paybackBreak-even sale priceCO₂, water, land, jobs26 impact indicatorsUncertainty P5–P95Decision file (17 sections)NOT INCLUDEDfinancing, tax, subsidies,residual value, dispatch
Figure 2. You describe the project, the review supplies the engineering constants, and the engine estimates the results. Items outside the review's boundary are listed in every report but not calculated.

§03

The 13 steps, one by one

Steps 1–3 happen once per project. Steps 4–11 are the tabs of the scenario editor, numbered §1–§8 in the workspace; you can move between them freely, and the Help for this step link in each tab brings you back to the matching part of this guide.

1

Sign in

Open workspace · top right

Click Open workspace and sign in with your e-mail address and password, or with Google. New users create an account on the same page.

You can changeYour account details.
Watch outAlways use the same account: projects are stored per account and are visible only to you and to the platform operator.
2

Create a project

Your projects · New project

A project stands for one site or one development programme and holds any number of scenarios. Fill in the project name, the country (two-letter code, e.g. CA, GB, DE), the reporting currency, the base year and the commissioning year, then click Create.

  1. Key 1Country. the country where the plant will stand. It sets the default currency, the location and labour factors and the grid carbon intensity offered later.
  2. Key 2Currency and years. the currency you report in and the year you expect the plant to start. Both can be adjusted later in the Monetary tab.
You can changeName, country, currency, base year and commissioning year.
Watch outDeleting a project also deletes all its scenarios and saved versions.
3

Create a scenario

Project page · New scenario

A scenario is one variant of the project, e.g. “AEL 20 MW with tank storage”. Give it a name and choose the mode, then click Create. The scenario editor opens on its first tab.

  1. Key 1Mode. choose New plant scenario for a plant still to be built. Choose Existing plant assessment only for an operating plant: it applies the review's faster fade for older stacks (× 1.2) and opens the learning-rate tools.
You can changeName and mode, and you can create as many scenarios as you like.
Watch outCompare options by making one scenario per option (technology, size, route) rather than overwriting one scenario.
4

Identity and plant location

Editor tab §1 · Identity

Enter the project name and organisation, the assessment mode, the purpose (Screening or Advanced analysis) and the reporting language (English or French). Then place the plant: search for the town or region, or choose the country; latitude and longitude are optional. Tick Confidential to keep the scenario out of the benchmark corpus.

  1. Key 1Plant location. the most important entry of this tab. It fills in the country, region and coordinates, and it sets the country and reporting currency of the Monetary tab.
  2. Key 2Purpose. Screening for a first comparison; Advanced analysis when you intend to enter your own local values in the Corrections tab.
You can changeEvery field of this tab.
Estimated for youCountry defaults for currency, location factor, labour factor and grid intensity.
Watch outChanging the country also changes the reporting currency to that country's currency.
5

Monetary basis

Editor tab §2 · Monetary

Check the country, base year, commissioning year, reporting currency and inflation index (Eurostat HICP, US BLS CPI or your own). All costs are calculated in EUR 2024, the cost basis of the review, and shown in the reporting currency with the ECB 2024 annual average rate.

  1. Key 1Escalate to the commissioning year. leave it off to stay with the review's EUR 2024 basis, which keeps results comparable with the paper. Switch it on only when you need costs in commissioning-year money.
  2. Key 2Exchange-rate override and local cost multiplier. optional. Use them only with a documented source, e.g. a contract exchange rate or a local cost study.
You can changeYears, currency, inflation index, escalation, exchange-rate override, local multiplier.
Fixed by the reviewThe EUR 2024 cost basis and the ECB 2024 average rate, unless you override them.
6

Corrections

Editor tab §3 · Corrections

This tab adapts the review's Western-European values to your site. For the location factor X_L, the labour factor k_L and the transfer coefficients K1/K2 you choose Automatic or Manual. Local values for the fatality rate, community share and land price use screening defaults until you enter project data.

  1. Key 1Automatic or manual. keep Automatic unless you have a local study. A manual value needs a source and is printed in the decision file.
  2. Key 2K2. enter it only when you have an indicator-compatible value; it cannot be derived from the CO₂ intensity.
You can changeManual X_L, k_L, K1, K2 and the local coefficients.
Estimated for youAutomatic factors for your country and K1 from the technology's SEC.
7

Utilities

Editor tab §4 · Utilities

Enter the electricity price with its unit and currency (EUR/MWh, CAD/MWh, ct/kWh and others are converted once), the tariff type (PPA, wholesale, retail or self-generated), the supply mix, the emission factor and the supply availability. Then the water source, scarcity and price, and, for SOEC, the heat supply.

  1. Key 1Electricity price. the single most important input: in the review's AEL case electricity makes up about two thirds of the yearly cash costs. Use the price you would actually pay at the plant, and compare it later with market data in the Simulation tab. It drives the LCOH, the NPV and the break-even price.
  2. Key 2Emission factor. the lifecycle carbon intensity of your supply in g CO₂-eq/kWh. It sets the GWP. The review's case uses 40 g/kWh (solar PV); for grid supply the Ember 2024 country average is offered.
  3. Key 3Water price. a smaller cost item; the review's reference is 2 €/m³.
You can changeAll entries; any unit or currency is accepted.
Watch outThe capacity factor used in the calculation is the Utilisation (%) of the Production tab; keep the supply availability entered here consistent with it.
8

Production

Editor tab §5 · Production

Choose the electrolyser, the capacity Q (0.1 to 1,000 MW), the utilisation, i.e. the capacity factor, and the lifetime. The tab shows at once the yearly hydrogen output, the effective SEC, the efficiency, the year-t and lifecycle LCOH. Further options: the reporting year, the degradation age basis, the OPEX basis, the SOEC heat supply and the existing-plant settings.

  1. Key 1Technology. in the review's 12 MW case AEL has the lowest LCOH (3.58 €/kg) and CAPEX (12.31 M€) and the longest stack life (80,000 h); PEM follows at 4.21 €/kg (60,000 h); SOEC reaches 5.00 €/kg with the highest CAPEX (38.89 M€) and a 20,000 h stack, but uses the least electricity when industrial heat is available. If unsure, create one scenario per technology or use the weighted ranking in the Simulation tab, which runs all three.
  2. Key 2Capacity. the CAPEX law C = A · Q^β gives a lower cost per kW for larger plants. The law is calibrated from 1 to 1,000 MW.
  3. Key 3Utilisation (capacity factor). the dominant sensitivity of the review (§5.3.1). Use 90 % (the review's basis, 7,884 h per year) for a firm supply, and the real running hours for variable renewable supply, e.g. about 16–18 % for solar only.
  4. Key 4Lifetime and reporting year. the review uses 25 years and reports year 1; a later reporting year shows the effect of stack ageing.
You can changeTechnology, capacity, utilisation, lifetime, reporting year, OPEX basis, SOEC heat supply.
Fixed by the reviewInstalled-CAPEX law, SEC, stack life and stack share φ, fade rate and water demand, unless you switch on manual entry to use vendor data.
Estimated for youOutput, SEC over time, stack replacements, LCOH.
Watch outSaved values that differ from the review's are not used while manual entry is off; they are listed as “replaced by the review's defaults”.
9

Storage

Editor tab §6 · Storage

Choose the storage type, the share of production that is stored and the storage duration X in hours. The tab shows the inventory M, the price per kg of capacity, the CAPEX, the conditioning energy and the LCOS. Up to four storage units can be combined.

  1. Key 1Storage type. 350 or 700 bar tanks for hours to a few days of output; salt or lined-rock caverns for large inventories of 100 t or more where the geology allows; buried pipe storage is a niche option; liquid hydrogen and LOHC are benchmarks only. The platform warns when a tank inventory exceeds the cavern threshold.
  2. Key 2Share and duration. the share of the output that passes through storage and the time it must cover; the review's case stores 60 % for 24 h. Inventory M = share × hourly output × X.
  3. Key 3Quote override. enter a supplier price per kg of capacity to replace the review's pricing law; 0 keeps the law.
You can changeType, share, duration, quote override.
Fixed by the reviewPricing laws, 2 % O&M and the compression work 0.66 · ln(P/30) kWh/kg.
Estimated for youInventory, CAPEX, energy, losses and LCOS.
Watch outA share above 0 with a duration of 0 h has no tank cost but still carries compression energy and losses.
10

Transport

Editor tab §7 · Transport

Add one delivery leg per destination or route (up to ten): the mode, the share of the output, the distance and the pricing. The distance can be measured on the map between origin and destination. The tab shows the flow, the LCOT and the yearly cost of each leg.

  1. Key 1Mode. GH₂ tube trailer and LH₂ truck chain follow the review's laws; a dedicated pipeline uses the investment law of Eq. 45; the existing gas network is a service tariff; LH₂ and LOHC ships are benchmarks only.
  2. Key 2Trailer or pipeline. pipelines need large, steady flows. The review's crossover is about 46 t/day at 100 km and moves with distance; the platform checks each leg and says which mode has the lower CAPEX.
  3. Key 3Pricing. Paper law, or a contract tariff in €/kg when you have an offer.
You can changeLegs, modes, shares, distances, pricing.
Fixed by the reviewTransport cost laws; delivery is bought as a service, so no transport asset enters I₀ (§5.10).
Estimated for youFlow per leg, LCOT, transport cost, mass losses.
Watch outThe shares must add up to 100 % or less; the remainder is sold at the plant gate. Shares above 100 % stop the calculation until corrected.
11

Simulation

Editor tab §8 · Simulation

Click Run full simulation. All results appear below and are recalculated as soon as you change an input; the capacity slider and the capacity factor field let you test sizes directly. The panels follow the calculation chain: model scope and boundary, decision gates, model self-checks, cost basis, costs by block, delivered cost, charts, result passport, delivery map, investment decision with the calculation written out step by step, prices against market data, weighted decision layer, finance, environmental and social impacts, uncertainty and learning.

  1. Key 1Sale price, WACC and bank rate. set them in the Finance panel. The review uses €6.38/kg, a WACC of 8 % and a bank rate of 2.25 %; the buttons apply a live central-bank rate instead.
  2. Key 2Prices against market data. compares your electricity price with the market of the project country and shows the NPV, payback and break-even at each price; a use button takes the market price into the scenario.
  3. Key 3Uncertainty ranges and weights. adjust the ranges of the Latin hypercube analysis (P5–P95) and the weights of profit, cost, environment and social in the ranking.
You can changeCapacity, capacity factor, sale price, WACC, bank rate, uncertainty ranges, weights.
Estimated for youEvery result of the platform, including I₀, NPV, IRR, payback, break-even price, GWP and the 26 indicators.
Watch outIf the model self-checks are not all green, or a panel lists ignored or replaced inputs, read the notes before using the results.
12

Save a version

Editor · Save version (top right)

Click Save version. Each save creates a new numbered version; earlier versions are kept, and the decision file is built from the latest saved version.

You can changeYou can save as often as you like.
Watch outSave before leaving the page, so that the decision file shows your latest inputs.
13

Download the decision file

Simulation · Full decision file

Open Full decision file to see the report on screen, then choose Print / save PDF or Download (HTML). The Download PDF report button of the Simulation tab opens the same document ready for printing. In the print dialog choose “Save as PDF”, A4, with background graphics.

Estimated for youA report of about 20 pages with 17 sections and nine figures, built from your own scenario (see §07 below).
Watch outThe report prints the scope and limits of the review's model on every issue, so it can be shared without losing that context.

§04

What you can change, what is fixed, what is estimated

ItemStatusWhere
Plant location, country, currency, yearsYou chooseIdentity, Monetary
Electricity price, tariff, mix and emission factor; water and heatYou chooseUtilities
Technology, capacity, capacity factor, lifetimeYou chooseProduction
Storage type, share, duration; delivery legs and tariffsYou chooseStorage, Transport
Sale price, WACC, bank rate, uncertainty ranges, decision weightsYou chooseSimulation
Installed-CAPEX law, SEC, stack life and share, fade rate, water demandFixed by the reviewProduction (manual entry possible)
Reference OPEX curveFixed by the reviewProduction (other OPEX bases selectable)
Storage and transport cost lawsFixed by the reviewStorage, Transport (quote or tariff possible)
Environmental and social coefficientsFixed by the reviewCorrections (K2 and local values can be entered)
EUR 2024 cost basis and ECB 2024 average exchange rateFixed by the reviewMonetary (escalation and override possible)
Output, LCOH, LCOS, LCOT and delivered costEstimated by the platformProduction to Simulation
I₀, NPV, IRR, payback, break-even price, full-cost profitEstimated by the platformSimulation
GWP, water, land, jobs and the 16 + 10 register indicatorsEstimated by the platformSimulation
P5–P95 ranges and tornado sensitivityEstimated by the platformSimulation
Financing, tax, subsidies, residual value, construction period, hourly dispatch, by-products, regulatory eligibility, site engineeringNot estimatedOutside the review's boundary: listed, not calculated

§05

How to choose: a quick decision chart

The chart summarises the review's guidance for the three main design choices. It is a starting point; the Simulation tab shows the actual numbers for your site.

Which electrolyser?

  • Lowest cost at a firm supplyAEL
  • Variable supply (minimum load about 5 % against 20 % for AEL)PEM
  • Industrial waste heat on siteSOEC
  • Not sureRun all three (ranking)

Which storage?

  • Hours to a few days350 or 700 bar tank
  • 100 t or more, suitable geologySalt or lined-rock cavern
  • No buffer neededNo storage (share 0 %)

Which delivery?

  • Small flow or long distanceGH₂ tube trailer
  • Above about 46 t/day at 100 kmDedicated pipeline
  • Existing gas-network connectionGas network (tariff)
  • Customer at the gateNo leg (sold at the gate)

For the capacity factor, use the running hours your electricity supply allows: about 90 % for a firm grid or contract supply, much lower for solar or wind alone. For the electricity price, use the price at the plant, including any network charges you will pay.

§06

Reading the results

  • Screening signal. The preliminary gate compares the production LCOH with a benchmark band of 3.5–6.0 €/kg: favourable below the band, marginal inside it, unfavourable above it. The final gate compares the delivered cost with the sale price and the operational GWP with the upper end of the published range of 1–3 kg CO₂/kg (Table 58): favourable when the sale price exceeds the delivered cost by at least €0.50/kg and the GWP is within the range, unfavourable when both fail, and marginal in between. The signal is advisory: H₂VALIS never rejects a project.
  • Evidence badges. Calculated: computed by the engine from the review's equations. Literature: taken from a published source. Proxy: transferred from a reference case and in need of site data. Scenario: an assumption you entered. Unavailable: no data.
  • Result passport and self-checks. Each headline result is listed with its equation, source, confidence, uncertainty and validity range, and the engine's self-checks should all be green.
  • Calculation written out. The investment panel and §8 of the report show every step from I₀ to the NPV and the break-even price with your numbers, so each figure can be checked by hand.
  • Live reference gateway. The bar at the top of the workspace shows exchange rates, electricity prices, central-bank rates and inflation as published. These values are context: they enter a scenario only when you click one of the use or apply buttons.

§07

What the decision file contains

CoverLogo, project, place, technology, size, headline results, contents and the screening note
1 Executive summaryTen key figures, screening signal, main sensitivities and scope
2 Project, location and basisSite, mode, cost basis, location and labour factors
3 Inputs and sourcesEvery input with value, origin and price basis; replaced inputs
4 ProductionOutput, SEC, CAPEX, OPEX, stack replacements, LCOH; SEC figure
5 StorageInventory, CAPEX and LCOS of each unit
6 Transport and deliveryEach leg, the trailer–pipeline check and the delivery map
7 Delivered costCost build-up, CAPEX and OPEX by block (three figures)
8 Earnings and investmentI₀, NPV, IRR, payback, break-even, cash-flow figure, the calculation written out and the market price check
9 EnvironmentGWP, water, land and the 16-indicator register
10 SocialEmployment, local content and the 10-indicator register
11 Uncertainty and sensitivityP5, P50, P95, histogram, tornado and capacity-factor curve
12 Existing plant and learningCost time shift and learning rate, for existing plants
13 Decision gatesPreliminary and final gate, signal and sign-off fields
14 Result passportEquation, source, confidence, uncertainty and validity of each result
15 Model checksThe engine's self-checks
16 Model scope and boundaryWhat the review's model includes and leaves out
17 ReferencesThe full reference list [1]–[78] of the review

§08

Questions

Why is my NPV negative?

Most often the electricity price is high compared with the sale price, the capacity factor is low, or long transport legs add cost. Look at the market price check and the break-even price in the Simulation tab: they show which price would make the project break even.

Why does the payback say “never”?

Because the yearly revenue is lower than the yearly cash costs, so the investment is never recovered, whatever the plant life.

Why were some of my saved values replaced?

Manual entry is off, so the review's constants are used. The replaced values are listed in the investment decision panel, the model scope panel and §3 of the report; switch on manual entry in Production to use your own.

Can I use my own CAPEX or supplier prices?

Yes: manual entry in Production for the electrolyser, the quote override in Storage and a contract tariff in Transport.

In which currency are the results?

In EUR 2024, the review's basis, and in your reporting currency with the ECB 2024 average rate, unless you entered an override.

Why do the live values not change my result?

They are shown for context. Click a use or apply button to bring a market electricity price or a central-bank rate into the scenario.

How often do the live values change?

Exchange rates and central-bank rates once per working day, day-ahead electricity every 15 minutes, the GB market index every 30 minutes and inflation monthly. The UK Bank Rate is a fixed five-month average.

Can I compare technologies or sizes?

Yes: create one scenario per option, or use the weighted ranking of the Simulation tab, which runs PEM, AEL and SOEC with the same inputs.

Is the result bankable?

No. H₂VALIS is a screening tool for comparing options. A real project needs site data, vendor quotes and a detailed financial model.

§09

Glossary

Rest the cursor on a term, or tab to it with the keyboard, to see its definition; the same definitions are listed here.

LCOH · Levelised cost of hydrogen
The cost of producing one kilogram of hydrogen when the investment is spread over the plant life. H₂VALIS shows the value for the reporting year (§5.4) and a lifecycle value that also counts stack replacements (§4.1.6). In the review's 12 MW case it is 4.21 (PEM), 3.58 (AEL) and 5.00 (SOEC) €/kg.LCOH = (CAPEX · CRF + OPEX) / annual hydrogen output
LCOS · Levelised cost of storage
The cost of storing one kilogram of hydrogen: the storage investment spread over the plant life, plus operation and the compression or conditioning energy, divided by the kilograms that pass through storage (Eq. 39–42a). About 0.22 €/kg for the 350 bar tank of the case study.LCOS = (C_storage · CRF + O&M + energy) / kg stored
LCOT · Levelised cost of transport
The cost of carrying one kilogram of hydrogen along a delivery leg. For tube trailers the review uses 0.35 + 0.52 · d/100 €/kg (6.59 €/kg over 1,200 km); for pipelines the investment law of Eq. 45 spread over the flow.Trailer: LCOT = 0.35 + 0.52 · d/100 · Pipeline: LCOT = (C · CRF + O) / M
capacity factor · Capacity factor (CF)
The share of the year the electrolyser runs at full power, i.e. operating hours divided by 8,760. The review's economic basis is 0.90 (7,884 h per year). It is the strongest single driver of the LCOH (§5.3.1): at a solar-only factor of about 0.17 the production LCOH of the case rises about 2.5 times.CF = operating hours / 8,760 h
SEC · Specific energy consumption
The electricity needed to produce one kilogram of hydrogen, in kWh/kg. At the beginning of life the review uses 55 (PEM), 52 (AEL) and 41 kWh/kg (SOEC, plus 7.9 kWh of heat, or 48.9 kWh/kg when the steam is made electrically). It rises as the stack ages and returns to the start value at each stack replacement.SEC(t) = SEC₀ / (1 − r · t)
CRF · Capital recovery factor
Turns a one-off investment into an equal yearly payment over the plant life at the discount rate. At 8 % over 25 years the CRF is 0.0937, so each euro invested costs about 9.4 cents per year.CRF = r(1 + r)^N / ((1 + r)^N − 1)
WACC · Weighted average cost of capital
The real discount rate used for the CRF, the NPV and as the hurdle for the IRR. The review uses one project rate of 8 % (§5.10); the mix of debt and equity behind it is not modelled. You can change it in the Finance panel.
NPV · Net present value
The value today of all future cash flows minus the investment, with stack replacements charged at their real dates (§5.10). A positive NPV means the plant earns more than the WACC; a negative NPV means it does not, at the sale price entered.NPV = −I₀ + Σ CF_t / (1 + r)^t − Σ φ·C · (1 + r)^−τ
IRR · Internal rate of return
The discount rate at which the NPV is exactly zero. It is compared with the WACC; it is shown as “n/a” when the yearly cash flow is negative, because no rate can then make the NPV zero.NPV(IRR) = 0
GWP · Global warming potential
Greenhouse-gas emissions per kilogram of hydrogen, in kg CO₂-equivalent per kg. The operational value is the specific energy times the carbon intensity of the electricity (§5.8); it is compared with the published green-hydrogen range of 1–3 kg CO₂/kg (Table 58). Storage, transport and embodied emissions are added for the delivered total.GWP_operational = SEC × carbon intensity of the electricity
X_L · Location factor X_L
Multiplies the review's Western-European installed CAPEX to reflect construction costs at the project location. X_L = 1 is the review's convention; it can be taken automatically from the country or entered manually with a source in the Corrections step.
k_L · Labour factor k_L
Scales the labour-related part of the non-electric OPEX and the monetised social indicators to local wage levels, relative to the Western-European reference. Automatic from the country, or entered manually in the Corrections step.
K1/K2 · Transfer coefficients K1 and K2
Move the environmental reference indicators to your project (§3.8). K1 follows the energy use of the chosen technology (K1 = SEC / 55). K2 is used only when you enter a value that fits the indicator in question, e.g. acidification or particulates, because it cannot be derived from the CO₂ intensity alone.K1 = SEC / 55
CAPEX · Capital expenditure
The one-off investment in the installed plant. For electrolysers H₂VALIS uses the review's law C = A · Q^β, so larger plants cost less per kW (scale economics).C = A · Q^β
OPEX · Operating expenditure
The yearly running cost: electricity, operation and maintenance, labour, water and, for SOEC, heat. Stack replacements are counted separately at their dates.
I₀ · Initial investment I₀
The money spent at the start (year 0): production CAPEX plus storage CAPEX. Transport is bought as a service, so no transport asset is included (§5.10).I₀ = C_production + C_storage
break-even price · Break-even sale price
The hydrogen sale price at which the NPV is exactly zero. If your sale price is lower, the project does not recover its investment at the chosen WACC.p* = [(I₀ + PV of replacements) · CRF + yearly cash costs] / kg delivered
P5–P95 · P5, P50 and P95
Results of the uncertainty analysis (§4.6.3): 5 % of the sampled cases lie below P5, half below P50 and 95 % below P95. The band P5–P95 shows how far the result can move when the uncertain inputs vary within their ranges.
Q_H₂,LHV · Hydrogen output capacity Q_H₂,LHV