Sign in
Open workspace · top rightClick Open workspace and sign in with your e-mail address and password, or with Google. New users create an account on the same page.
User guide
This guide takes you through an assessment from the first sign-in to the downloaded decision file. Each step explains what to enter, how to choose it, what you can change, what the review fixes and what the platform estimates for you. Terms with a dotted underline, such as LCOH or NPV, show their definition when you rest the cursor on them.
§01
H₂VALIS estimates what a green-hydrogen plant of a given size would produce, cost and earn at a given site, and what its environmental and social footprint would be. Every number comes from the equations of the literature review on which the platform is built, and every number is tied to the installed capacity:
installed capacity → hydrogen production → production, storage and delivery cost → earnings (revenue, NPV, IRR) → environmental and social impact
It is a screening tool for comparing options, e.g. two technologies, two plant sizes or two delivery routes. The results can be close to or far from a real project, so they do not replace a feasibility study, site data or vendor quotes, and they are not investment advice.
§02
An assessment takes about ten minutes when the following information is at hand. Anything you do not know can stay at the review's default value.
§03
Steps 1–3 happen once per project. Steps 4–11 are the tabs of the scenario editor, numbered §1–§8 in the workspace; you can move between them freely, and the Help for this step link in each tab brings you back to the matching part of this guide.
Click Open workspace and sign in with your e-mail address and password, or with Google. New users create an account on the same page.
A project stands for one site or one development programme and holds any number of scenarios. Fill in the project name, the country (two-letter code, e.g. CA, GB, DE), the reporting currency, the base year and the commissioning year, then click Create.
A scenario is one variant of the project, e.g. “AEL 20 MW with tank storage”. Give it a name and choose the mode, then click Create. The scenario editor opens on its first tab.
Enter the project name and organisation, the assessment mode, the purpose (Screening or Advanced analysis) and the reporting language (English or French). Then place the plant: search for the town or region, or choose the country; latitude and longitude are optional. Tick Confidential to keep the scenario out of the benchmark corpus.
Check the country, base year, commissioning year, reporting currency and inflation index (Eurostat HICP, US BLS CPI or your own). All costs are calculated in EUR 2024, the cost basis of the review, and shown in the reporting currency with the ECB 2024 annual average rate.
This tab adapts the review's Western-European values to your site. For the location factor X_L, the labour factor k_L and the transfer coefficients K1/K2 you choose Automatic or Manual. Local values for the fatality rate, community share and land price use screening defaults until you enter project data.
Enter the electricity price with its unit and currency (EUR/MWh, CAD/MWh, ct/kWh and others are converted once), the tariff type (PPA, wholesale, retail or self-generated), the supply mix, the emission factor and the supply availability. Then the water source, scarcity and price, and, for SOEC, the heat supply.
Choose the electrolyser, the capacity Q (0.1 to 1,000 MW), the utilisation, i.e. the capacity factor, and the lifetime. The tab shows at once the yearly hydrogen output, the effective SEC, the efficiency, the year-t and lifecycle LCOH. Further options: the reporting year, the degradation age basis, the OPEX basis, the SOEC heat supply and the existing-plant settings.
Choose the storage type, the share of production that is stored and the storage duration X in hours. The tab shows the inventory M, the price per kg of capacity, the CAPEX, the conditioning energy and the LCOS. Up to four storage units can be combined.
Add one delivery leg per destination or route (up to ten): the mode, the share of the output, the distance and the pricing. The distance can be measured on the map between origin and destination. The tab shows the flow, the LCOT and the yearly cost of each leg.
Click Run full simulation. All results appear below and are recalculated as soon as you change an input; the capacity slider and the capacity factor field let you test sizes directly. The panels follow the calculation chain: model scope and boundary, decision gates, model self-checks, cost basis, costs by block, delivered cost, charts, result passport, delivery map, investment decision with the calculation written out step by step, prices against market data, weighted decision layer, finance, environmental and social impacts, uncertainty and learning.
Click Save version. Each save creates a new numbered version; earlier versions are kept, and the decision file is built from the latest saved version.
Open Full decision file to see the report on screen, then choose Print / save PDF or Download (HTML). The Download PDF report button of the Simulation tab opens the same document ready for printing. In the print dialog choose “Save as PDF”, A4, with background graphics.
§04
| Item | Status | Where |
|---|---|---|
| Plant location, country, currency, years | You choose | Identity, Monetary |
| Electricity price, tariff, mix and emission factor; water and heat | You choose | Utilities |
| Technology, capacity, capacity factor, lifetime | You choose | Production |
| Storage type, share, duration; delivery legs and tariffs | You choose | Storage, Transport |
| Sale price, WACC, bank rate, uncertainty ranges, decision weights | You choose | Simulation |
| Installed-CAPEX law, SEC, stack life and share, fade rate, water demand | Fixed by the review | Production (manual entry possible) |
| Reference OPEX curve | Fixed by the review | Production (other OPEX bases selectable) |
| Storage and transport cost laws | Fixed by the review | Storage, Transport (quote or tariff possible) |
| Environmental and social coefficients | Fixed by the review | Corrections (K2 and local values can be entered) |
| EUR 2024 cost basis and ECB 2024 average exchange rate | Fixed by the review | Monetary (escalation and override possible) |
| Output, LCOH, LCOS, LCOT and delivered cost | Estimated by the platform | Production to Simulation |
| I₀, NPV, IRR, payback, break-even price, full-cost profit | Estimated by the platform | Simulation |
| GWP, water, land, jobs and the 16 + 10 register indicators | Estimated by the platform | Simulation |
| P5–P95 ranges and tornado sensitivity | Estimated by the platform | Simulation |
| Financing, tax, subsidies, residual value, construction period, hourly dispatch, by-products, regulatory eligibility, site engineering | Not estimated | Outside the review's boundary: listed, not calculated |
§05
The chart summarises the review's guidance for the three main design choices. It is a starting point; the Simulation tab shows the actual numbers for your site.
Which electrolyser?
Which storage?
Which delivery?
For the capacity factor, use the running hours your electricity supply allows: about 90 % for a firm grid or contract supply, much lower for solar or wind alone. For the electricity price, use the price at the plant, including any network charges you will pay.
§06
§07
| Cover | Logo, project, place, technology, size, headline results, contents and the screening note |
| 1 Executive summary | Ten key figures, screening signal, main sensitivities and scope |
| 2 Project, location and basis | Site, mode, cost basis, location and labour factors |
| 3 Inputs and sources | Every input with value, origin and price basis; replaced inputs |
| 4 Production | Output, SEC, CAPEX, OPEX, stack replacements, LCOH; SEC figure |
| 5 Storage | Inventory, CAPEX and LCOS of each unit |
| 6 Transport and delivery | Each leg, the trailer–pipeline check and the delivery map |
| 7 Delivered cost | Cost build-up, CAPEX and OPEX by block (three figures) |
| 8 Earnings and investment | I₀, NPV, IRR, payback, break-even, cash-flow figure, the calculation written out and the market price check |
| 9 Environment | GWP, water, land and the 16-indicator register |
| 10 Social | Employment, local content and the 10-indicator register |
| 11 Uncertainty and sensitivity | P5, P50, P95, histogram, tornado and capacity-factor curve |
| 12 Existing plant and learning | Cost time shift and learning rate, for existing plants |
| 13 Decision gates | Preliminary and final gate, signal and sign-off fields |
| 14 Result passport | Equation, source, confidence, uncertainty and validity of each result |
| 15 Model checks | The engine's self-checks |
| 16 Model scope and boundary | What the review's model includes and leaves out |
| 17 References | The full reference list [1]–[78] of the review |
§08
Most often the electricity price is high compared with the sale price, the capacity factor is low, or long transport legs add cost. Look at the market price check and the break-even price in the Simulation tab: they show which price would make the project break even.
Because the yearly revenue is lower than the yearly cash costs, so the investment is never recovered, whatever the plant life.
Manual entry is off, so the review's constants are used. The replaced values are listed in the investment decision panel, the model scope panel and §3 of the report; switch on manual entry in Production to use your own.
Yes: manual entry in Production for the electrolyser, the quote override in Storage and a contract tariff in Transport.
In EUR 2024, the review's basis, and in your reporting currency with the ECB 2024 average rate, unless you entered an override.
They are shown for context. Click a use or apply button to bring a market electricity price or a central-bank rate into the scenario.
Exchange rates and central-bank rates once per working day, day-ahead electricity every 15 minutes, the GB market index every 30 minutes and inflation monthly. The UK Bank Rate is a fixed five-month average.
Yes: create one scenario per option, or use the weighted ranking of the Simulation tab, which runs PEM, AEL and SOEC with the same inputs.
No. H₂VALIS is a screening tool for comparing options. A real project needs site data, vendor quotes and a detailed financial model.
§09
Rest the cursor on a term, or tab to it with the keyboard, to see its definition; the same definitions are listed here.