§01 · Delivery status
Five waves
The first four waves are in use today, and the fifth is partly delivered. Each item below is marked as delivered, partly delivered or not yet available, and only results that reproduce the review's case study are shown as calculated.
✓ delivered · ◐ partly delivered · ○ not yet · status of 10 November 2026, engine 2.2.9
Wave 1
Delivered
Brand, scientific design system and public flagship
- ✓Design tokens, typography and the evidence-status badges (calculated, literature, proxy, scenario, unavailable)
- ✓Public pages: home, methodology, pathways, scientific basis, case study (computed live by the engines), atlas, workflow and roadmap
- ✓Sign-in, workspace shell and the custom domain h2valis-dal.com
Wave 2
Delivered
Workspace, forms, contextual data and harmonisation
- ✓Projects with versioned scenarios; older saved versions are loaded section by section and reported when a section no longer fits
- ✓Assessment mode: new plant or existing plant, with the review's learning-rate analysis
- ✓Live reference gateway: ECB and Bank of Canada exchange rates in any base, day-ahead and within-day electricity prices, central-bank rates, inflation and dated hydrogen references, refreshed every 60 s
- ✓Harmonisation of the EUR 2024 cost basis to the project year, location, labour cost and reporting currency
- ◐Audit trail: every saved version is kept with its inputs; a separate event log exists in the database but is not yet written
- ◐Grid carbon intensity from the Ember 2024 country table (not a live feed); water price entered by the user
Wave 3
Delivered
Scientific pathway engines: production, storage and transport
- ✓Equation register with the review's laws, section references and a versioned engine (h2valis-engine 2.2.x)
- ✓PEM, AEL and SOEC production from 0.1 MW to 1 GW, with efficiency fade, stack replacement and the year-t and lifecycle LCOH
- ✓Preliminary production-only decision gate
- ✓Storage: 350 and 700 bar tanks, lined rock and salt caverns and pipe storage with the review's pricing laws, liquid hydrogen and LOHC with screening values, and feasibility warnings
- ✓Transport: CGH₂ and LH₂ trucks, pipelines and the gas network as a service, with the trailer–pipeline crossover check; shipping as a benchmark only
- ○Rail transport (the review gives no fitted cost law for it)
- ✓Integrated mass, energy, loss and cost balance and the delivered cost of Eq. 14
Wave 4
Mostly delivered
Finance, impacts, uncertainty, learning and decision support
- ✓Cash flow of §5.10: I₀, NPV, IRR, payback, break-even sale price, full-cost profit Π and the bank comparison, with every step written out
- ✓Electricity and hydrogen prices compared with market data of the project country
- ✓Environmental register (16 indicators) and social register (10 indicators) with evidence status
- ✓Latin hypercube uncertainty (P5, P50, P95), tornado sensitivity and the capacity-factor curve
- ✓Existing plant and learning mode: cost time shift (Eq. 20), two-point and regression learning rates, diagnosis of Table 45
- ✓Weighted multi-criteria ranking of PEM, AEL and SOEC
- ○New indicators DHVM, Evidence Coverage Score and confidence-weighted LCOH
- ○Side-by-side comparison dashboard of saved scenarios
Wave 5
Partly delivered
Reports, open API, governance, validation and launch
- ✓Decision file generator: the same 17-section report on screen, as a printable PDF and as a downloadable HTML file
- ○Export to DOCX, CSV and JSON
- ○Open API /v1 for production, storage, transport, impacts, finance, scenarios and learning
- ◐Admin console: users, projects and scenarios overview; editing of the equation register, data catalogue and changelog is not yet available
- ◐Reference regression: 105 tests reproduce the review's case study and run before every release; they are not yet an automatic block on deployment
- ○Feedback and service rating, trademark clearance and formal launch
§02 · How a project is assessed today
From the plant location to the decision file
The workspace guides the user through eight steps in the scenario editor. Every number shown afterwards comes from one run of the same calculation chain, and the decision file prints exactly what the screen shows.
- 1
Sign in and create a project
The project holds the country and the reporting currency. Each project can hold several scenarios, and every save creates a new version.
- 2
Identity and plant location
Name the project, choose a new or an existing plant and set the purpose. The plant location is found by search or on the map, which fills in the country, region and coordinates and sets the country and reporting currency of the monetary step.
- 3
Monetary basis
Base year, commissioning year, reporting currency (taken from the country) and the inflation index. The review's EUR 2024 costs can be escalated to the commissioning year if wanted.
- 4
Corrections
Location factor X_L and labour factor k_L (automatic or manual), the transfer coefficients K1 and K2, and local values such as the fatality rate, community share and land price.
- 5
Utilities
Electricity price in any unit or currency, tariff type, supply mix, emission factor (the Ember 2024 country average is offered) and supply availability, i.e. the capacity factor; water source, price and scarcity; heat for SOEC.
- 6
Production
PEM, AEL or SOEC, installed capacity from 0.1 MW to 1 GW, capacity factor and lifetime. The review's constants are used unless manual entry is switched on.
- 7
Storage and transport
Storage type, share and duration, priced with the review's laws. Delivery legs with mode, share and distance (measured on the map), priced with the review's laws or a contract tariff.
- 8
Simulation
One run of the whole chain: model boundary, decision gates, self-checks, costs by block, delivered cost, figures, result passport, delivery map, investment decision with the calculation written out, prices against market data, weighted ranking, finance, impacts, uncertainty and learning. Capacity and capacity factor can be changed live.
- 9
Decision file
Save the version and open the decision file. It can be printed or saved as a PDF, or downloaded as an HTML file.
§03 · What the decision file contains
Seventeen sections, nine figures
The report is built for each scenario from its own inputs and results, so the values change with the project name, the location, the capacity and the electrolyser type. It runs to about 20 A4 pages.
| § | Section | Content |
|---|---|---|
| Cover | Logo, project, place, technology and size | Headline delivered cost, NPV and carbon intensity, contents, version, issue date and the screening note |
| 1 | Executive summary | Ten key figures, screening signal, main sensitivities and the model scope |
| 2 | Project, location and basis | Site, assessment mode, cost basis, location and labour factors |
| 3 | Inputs and sources | Every input with its value, origin and price basis, unit conversions and any saved values replaced by the review's defaults |
| 4 | Production | Output, specific energy, CAPEX, OPEX, stack replacements, year-t and lifecycle LCOH, figure of the specific energy over the plant life |
| 5 | Storage | Inventory, CAPEX and LCOS of each storage unit |
| 6 | Transport and delivery | Each leg with its cost, the trailer–pipeline check and, when the legs have coordinates, the delivery map |
| 7 | Delivered cost | Cost build-up, CAPEX and OPEX by block (three figures) |
| 8 | Earnings and investment | I₀, revenue, cash costs, NPV, IRR, payback, break-even price, cash-flow figure, the calculation written out step by step, and electricity and hydrogen prices compared with market data |
| 9 | Environment | Operational and delivered GWP, water and land, carbon-intensity figure and the 16-indicator register |
| 10 | Social | Employment, local content and the 10-indicator register |
| 11 | Uncertainty and sensitivity | P5, P50 and P95, probability of a positive NPV, histogram, tornado and capacity-factor curve |
| 12 | Existing plant and learning rate | Cost time shift and learning rate, when an existing plant is assessed |
| 13 | Decision gates | Preliminary and final gate, screening signal and sign-off fields |
| 14 | Result passport | Equation, source role, confidence, uncertainty and validity domain of each headline result |
| 15 | Model checks | The engine's self-checks with their results |
| 16 | Model scope and boundary | What the review's model includes and what it leaves out |
| 17 | References | Method and the full reference list [1]–[78] of the review |
Not included, as in the review: financing structure, taxes, subsidies, residual value, construction period, hourly dispatch and regulatory eligibility. The results are screening estimates and have to be checked with site data and vendor quotes before any investment.